wiki:4.2-FileFormats

This page is no longer actively maintained. Please see  http://trac.openmicroscopy.org.uk/ome/wiki/BioFormats-4.2-FileFormats instead.

Description

New file formats planned for 4.2, in roughly the order in which they are to be added.
Total estimated time is 44 days for all formats, and 21 days for the higher priority formats.

Breakdown

(more likely to be added)

  • #389 BD Pathway (estimated time: 1 day) required time: 1 day
    • A reader exists, but needs a few bug fixes before it can be committed.
  • #397 Nikon .nex (estimated time: 1.5 days)
    • XML file that can be associated with Nikon TIFFs
  • #457 Bio-Rad Gel (estimated time: 2.5 days) required time: 1.5 days
  • #439 SVI HDF (estimated time: 3 days)
  • #412 Formats supported by ImageSXM (estimated time: 13 days, 0.3 days per format)
    • Asylum Research
    • Burleigh r6015, required time: 0.2 days
    • DME
    • Pentax RAW (data/sxm/steve/DSLR raw files/*.PEF)
    • Digital Instruments Nanoscope
    • Gatan (NOT .dm3) (data/sxm/steve/Gatan) r5972, required time: 0.4 days
    • Hamamatsu .his r5912, required time: 0.5 days
    • JEOL r5993, required time: 0.3 days
    • JPK r6197, required time: 0.2 days
    • Klocke .stm
    • LEO r5830, required time: 0.2 days
    • Molecular Imaging r6197, required time: 0.2 days
    • NT-MDT
    • NanoMagnetics SIF
    • Nanonics
    • Nanonis
    • Nanosurf
    • Nanotec WSxM
    • Noran Vantage
    • Omicron
    • Oxford Instruments r5907, required time: 0.2 days
    • PDS
    • Park Scientific
    • Philips r5996, required time: 0.2 days
    • Quesant Instruments r6013, required time: 0.2 days
    • RHK Tech r6193, required time: 0.2 days
    • SBIG r6191, required time: 0.125 days
    • SM-Camera r5983, required time: 0.125 days
    • SPA-LEED
    • SPEC
    • Seiko Instruments r5984, required time: 0.125 days
    • Targa r5829, required time: 0.5 days
    • TopoMetrix r5985, required time: 0.2 days
    • UBM r6001, required time: 0.125 days
    • Unisoku r5908, required time: 0.3 days
    • VG SAM r5909, required time: 0.3 days
    • WA Technology
    • Wyko
    • ...and whatever is in 'data/sxm/steve/Misc SXM test images'

(less likely to be added)

  • #55 Volocity (estimated time: 10 days)
  • #297 Patch-Master (estimated time: 5 days)
  • #302 Vevo 770 (estimated time: 5 days)
  • #386 Leica OME (estimated time: 3 days)