New file formats planned for 4.2, in roughly the order in which they are to be added.
Total estimated time is 44 days for all formats, and 21 days for the higher priority formats.
Breakdown
(more likely to be added)
#389 BD Pathway (estimated time: 1 day)required time: 1 day- A reader exists, but needs a few bug fixes before it can be committed.
- #397 Nikon .nex (estimated time: 1.5 days)
- XML file that can be associated with Nikon TIFFs
#457 Bio-Rad Gel (estimated time: 2.5 days)required time: 1.5 days
- #439 SVI HDF (estimated time: 3 days)
- #412 Formats supported by ImageSXM (estimated time: 13 days, 0.3 days per format)
- Asylum Research
Burleighr6015, required time: 0.2 days- DME
- Pentax RAW (data/sxm/steve/DSLR raw files/*.PEF)
- Digital Instruments Nanoscope
Gatan (NOT .dm3) (data/sxm/steve/Gatan)r5972, required time: 0.4 daysHamamatsu .hisr5912, required time: 0.5 daysJEOLr5993, required time: 0.3 daysJPKr6197, required time: 0.2 days- Klocke .stm
LEOr5830, required time: 0.2 daysMolecular Imagingr6197, required time: 0.2 days- NT-MDT
- NanoMagnetics SIF
- Nanonics
- Nanonis
- Nanosurf
- Nanotec WSxM
- Noran Vantage
- Omicron
Oxford Instrumentsr5907, required time: 0.2 days- PDS
- Park Scientific
Philipsr5996, required time: 0.2 daysQuesant Instrumentsr6013, required time: 0.2 daysRHK Techr6193, required time: 0.2 daysSBIGr6191, required time: 0.125 daysSM-Camerar5983, required time: 0.125 days- SPA-LEED
- SPEC
Seiko Instrumentsr5984, required time: 0.125 daysTargar5829, required time: 0.5 daysTopoMetrixr5985, required time: 0.2 daysUBMr6001, required time: 0.125 daysUnisokur5908, required time: 0.3 daysVG SAMr5909, required time: 0.3 days- WA Technology
- Wyko
- ...and whatever is in 'data/sxm/steve/Misc SXM test images'
(less likely to be added)
- #55 Volocity (estimated time: 10 days)
- #297 Patch-Master (estimated time: 5 days)
- #302 Vevo 770 (estimated time: 5 days)
- #386 Leica OME (estimated time: 3 days)